From the Arctic to Africa

    Заказать продукт

    Выбранный продукт

    Цена:

    Ваше имя

    Телефон

    Количество

    Продолжая, вы соглашаетесь с политикой конфиденциальности


      Form

      Selected product

      Price:

      Your Name

      Your phone

      Quantity

      By continuing, you agree to privacy policy


        Заказать звонок

        Ваше имя

        Телефон

        Продолжая, вы соглашаетесь с политикой конфиденциальности

          Request a call

          Your Name

          Your number

          By continuing, you agree to privacy policy

            Разместить оборудование

            Ваше имя

            Телефон

            Продолжая, вы соглашаетесь с политикой конфиденциальности

              Leave a request

              Your Name

              Your number

              By continuing, you agree to privacy policy

              Wechat ID: @OlegK1106 or +79689515800
              Home Media From the Arctic to Africa

              From the Arctic to Africa

              Content

              BitCluster launches a 120 MW data center in Ethiopia. The facility with an area of 30 thousand square meters is located in Addis Ababa, the capital of Ethiopia, on the territory of the Kilinto high-voltage substation.

              The commissioning of the new data center will take place in January 2024. Transformers are currently being connected.

              The engineering and technical conditions of the data center meet the requirements of the most modern mining devices. 

              100% of the data center’s electricity comes from renewable energy sources, specifically

              from the Grand Ethiopian Renaissance Dam, the largest hydropower project in Africa with a capacity of 5.15 GW.

              The new energy infrastructure of the Kilinto high-voltage substation (230/33 kV) will ensure uninterrupted power supply to the facility with the expected uptime 99%.

              The facility has an advantageous location – 45 minutes by car to Bole International Airport, which makes access to the data center easy and fast, optimizing the price of equipment delivery. Optimal climate of the area, such as: air temperature 12-23 °C, absence of heat and dust create ideal operating conditions for mining equipment.

              BitCluster provides data center customers with full support in the supply, installation, connection and maintenance of devices. An integrated security system will be installed at the facility: 2 security perimeters, access control, video surveillance. The scale of the project allows to make a full-cycle service center, thereby saving time and money on the logistics of faulty devices to repair center, which makes mining more efficient.

              The key advantages of the project are: free capacity of 120 MW, duty-free import of equipment, low cost of electricity, advantageous location with easy access to key transport routes. 

              “Ethiopia, with its hydropower potential, will undoubtedly become a new place of attraction for global mining.” – comments Sergey Arestov, co-founder of BitCluster.

              Welcome to the new data center in Ethiopia!

              Related publications

              BitCluster supports education in Ethiopia: an IT classroom equipped near the Kilinto data center

              As part of its corporate social responsibility program, BitCluster...

              23 October, 2025
              BitCluster Sponsored The Bitcoin Summit ‘25 in Ethiopia

              On September 16, 2025, Addis Ababa hosted the annual summit of industry...

              26 September, 2025
              BitCluster Launches Its Own Bitcoin Mining Pool

              We’re pleased to announce the launch of the BitCluster Bitcoin Mining...

              27 June, 2025
              BitCluster at the Bitcoin 2025 Conference in Las Vegas

              From May 27 to May 29, 2025, the BitCluster team participated in the...

              27 June, 2025
              BitCluster at TerraCrypto X forum

              On May 25, the 10th anniversary Tetra crypto X forum was held in...

              27 May, 2024
              BitCluster took part at the World Digital Mining Summit (WDMS) in Oman

              On March 29, 2024, the World Digital Mining Summit (WDMS) was held in...

              1 April, 2024
              BitCluster received prestigious awards in industrial tourism!

              The tourist route named “From the Depths NA-GORA”, uncluding visiting the...

              16 November, 2023
              BitCluster installed a Steampunk-style Bitcoin sculpture

              Bitcoin sculpture or art object in the Steampunk style is installed by...

              15 January, 2021
              We are happy to inform you that data center BitCluster Nord is open

              The first batch of 150 machines of Antminers S19 has already been...

              15 October, 2020